Contact us Search
News, events
Services
References
Media
Gallery
TV spots
Presentations, publications
Tenders
About us
Links
Log in
Username:
Password:

Presentations

Categories »  Presentations, publicatons

Name of the directory
44th OECD/NEA-IAEA Uranium Group Meeting
ICEM'09/DECOM'09
Lakossgi tjkoztat - Gyngysoroszi 2011.08.03
Remediation of the uranium mining and processing legacy sites in Hungary and the related international experiences (presentations of the international conference)
WISSYM 2011 (25-27 May 2011 Ronneburg)
Order of the documents: Name | Date
Current order:  Name (A-Z)
pdf Application of dry covers for the closure of tailings facilities (article)
(Size: 3.88 MB, Uploaded: 2009.08.26. 20:07)
pdf Case study: Remediation of a former uranium mining/processing site in Hungary (article)
(Size: 2.39 MB, Uploaded: 2009.08.26. 20:15)
pdf Experimental iron barrier in Pécs, Hungary (article)
(Size: 1.98 MB, Uploaded: 2009.08.26. 20:19)
pdf Investigation into calcium oxide-based reactive barriers to attenuate uranium migration (article)
(Size: 0.55 MB, Uploaded: 2009.08.26. 20:22)
pdf Long-term performance of reactive materials in PRBs for uranium remediation (article)
(Size: 472.52 kB, Uploaded: 2009.08.26. 20:24)
pdf Major risks to the safety of uranium tailings facilities, and their environmental impacts (article)
(Size: 8.52 MB, Uploaded: 2009.08.26. 20:29)
pdf Mecsek Ore, Pécs, Hungary case study (article)
(Size: 3.60 MB, Uploaded: 2009.08.26. 20:31)
pdf Mine water treatment with yellowcake by-production (article)
(Size: 392.31 kB, Uploaded: 2009.08.26. 20:34)
pdf On-site column experiments (article)
(Size: 1.09 MB, Uploaded: 2009.08.26. 20:36)
pdf Post-closure Water Management Practice on the Former Uranium Mining Site in Hungary (article)
(Size: 3.06 MB, Uploaded: 2009.08.26. 20:39)
pdf Remediation of tailings ponds I and II. (article)
(Size: 3.75 MB, Uploaded: 2009.08.26. 20:42)
pdf Treatment of liquid effluents from uranium mines and mills during and after operation (article)
(Size: 11.00 MB, Uploaded: 2009.08.26. 20:47)
pdf Uranium ore mining and the remediation of the site in Hungary
(Size: 1.52 MB, Uploaded: 2009.08.26. 19:59)
pdf Uranium removal using elemental iron and hydroxyapatite in permeable reactive barriers (article)
(Size: 0.68 MB, Uploaded: 2009.08.26. 21:00)
pdf Water Treatment Issues at the Former Uranium Mining Site (article)
(Size: 451.25 kB, Uploaded: 2009.08.26. 21:03)
MECSEK-ÖKO Zrt. 7633 Pécs, Esztergár Lajos u. 19. Tel.: 72/535-260, Fax: 72/535-390 e-mail: mecsekoko@mecsekoko.hu